Coach panel

Coach panel – Mig aluminium welding Plant for welding the aluminium panels of the coach trains. The manipulator, with height adjustable boom (non-retractable ones), works both on the left and on the right side on jigs located parallel to the track on which its motorized base moves. On the boom have been installed : one…

Local train

Local train Plant for welding the frame and the roof of aluminium local trains. A manipulator, with height adjustable boom (not a retractable ones) and with a motorized base moving on rails delivering a work volume of 60 m length x 4.5 m width x 1.2 m height. On the boom has been installed one motorized…

High speed train

High speed train Plant for welding the frame and the roof of high speed trains. A gantry moves on rails with a work volume of 66 m length x 4.5 m width x 1.2 m height. Its crossbeam height is automatically adjustable and four motorized carriages are installed on it, each carriage equipped with diving boom stroke 1200 mm.…